Kukatpally
[Fixed] Status of Kukatpally to Hitechcity flyover by
sudhakar Via Loksatta Kukatpally
in Kukatpally Housing Board Colony
, about 1 year ago
Hi ,Subject : Status of Kukatpally to Hitechcity flyoverThis flyover is und...
Mosquito, street dongs problem and street lights by
Balaji Singh S in India
, about 1 month ago
Sir, I am staying at Panchami colony, Sri maremma Nagar,yellammabanda,Hyder...
Road winding in mainroad Bhagyanagar colony,kPHB by
ramana in Ayyappa Colony
, 5 months ago
HI, I am planing to take one flat in appartment. The flat ...
Road winding in mainroad Bhagyanagar colony,kPHB by
ramana in Ayyappa Colony
, 5 months ago
HI, I am planing to take one flat in appartment. The flat ...
Narrow Road by
Mike in Kalyan Nagar
, 9 months ago
This is to report a narrow road leading from AG. Colony near Sitaramanjeney...
Goats cutting in Tahasil office premises-reg. by
Rama chary Rachakonda Rachakonda in KPHB Phase I
, 10 months ago
Sir, Today at around 10-30 a.m. I went to MRO (Tahasil office), Balanagar...
Drainage Overflowing by
Rama chary Rachakonda in Mayur Marg
, 11 months ago
Grievance Nos.112541,112539,112538112537 to GHMC.,Secunderabad division. No...
Kalyan
From the four grievance#'s listed here, Only 112537 belongs to Drainage overflowing. From what I see in the GHMC site Sanitary Supervisor Dasradh is assigned to it and his Mobile# 9390009593 is provided. Did you try to call him and know the status ?
11 months ago
water tanker by
vivekananda pidikiti in Kavuri Hills
, 12 months ago
how to book a water tanker what details i have to be kept ready...
Kalyan
You can know the details from http://www.hyderabadwater.gov.in/wwo/
You can call from BSNL#155313 for the phone number corresponding to your area.
11 months ago
Dial Tanker water not yet sent by
Balajisingh
, about 1 year ago
I have booked a water tanker (5000 litres) on 14.05.2012 through HMWSSB DI...
Garbage beside Govt. school, Bagh ameer, Near Ramalayam by
Latha in Sumitra Nagar Colony
, about 1 year ago
I stay in santhi nagar, Kukatpally. Dialy i go to main road through Bagh ...




Thanks for the history
http://www.kukatpallynow.com/traffic-and-roads/64-traffic-and-roads-hitec-flyover.html
9 days ago
9 days ago
What happened to the previous budget sanctioned to the developer?
When the previous developer has not completed the bridge where did all the sanctioned funds disappear?
Did you know that this bridge has costed an additional Rs.50 Crores now (at according to official estimates)?
Did you know this is all tax payers money who struggled commuting through this route for the last 5-7 years without a bridge?
I am abroad - Can at least some one in Hyderabad probe this matter through RTI pls?
7 months ago
10 months ago
If there is one problem we can highlight in Kukatpally, it is the vexed issue of the HITEC City flyover. A third of the complaints we receive are about this issue. A few people ask us to travel during the rush hour to know what the pain is. Some of us do and are well aware of it. Instead of giving abstract speeches about the 'system', this is an attempt to list out the origin and progress of this issue so that the citizens can see for themselves what we have done and what we have not done.
1. The flyover was sanctioned in 2007. As is usual with government projects, the route was checked only superficially and it was not completely analyzed. The construction commenced.
2. When the construction approached the railway lines, the railway department got involved and objected. Since the flyover would go over their proposed electric lines, they put a hurdle that the construction cannot proceed. Now we have a deadlock.
3. This is when JP got elected (2009). JP and team realized that political pressure will not work because the railway department will simply show the rules that the existing design violates the railway rules.
4. We now started pushing the HMDA department to come-up with an alternate design but they said they did not have the budget. We found sources within the department that helped us raise this amount. In an instance which all volunteers remember, we had to move between 4 offices on a single day like a chase scene in a movie to get signatures from four principal secretaries. Now we have the work order for a new design.
5. HDMA agreed to start working on the alternate design. It took a few months to see this through and in an example of what we were doing in the interim, JP had to make nearly 40 phone calls to get the design passed.
6. We have a new design and the next step is for all the departments to agree to it. But the rivalry is so high that it took months and months of effort and meetings to make them sit and agree to all aspects. This finally happened in 2012.
7. 2012: Things are set as of now and all indications are that the flyover will be complete this year. JP also met the CM twice to ensure that there are no more delays.
about 1 year ago
http://articles.timesofindia.indiatimes.com/2012-01-15/hyderabad/30629601_1_hmda-scr-south-central-railway
http://www.thehindu.com/news/cities/Hyderabad/article2900990.ece
about 1 year ago
about 1 year ago
As per the new proposal,... two addl pillars(piers) will be laid on both sides of the track which will suddenly increase the height of the fly over.
After these two pillars are laid, a pier would be laid between the two tracks to join both the sides.
As of now, the process of laying two pierson both sides of the track is in progress... So, if work starts now, without any delay.... in another 3 mnths it must be ready. Interesting part is, everyday atleast one labourer will work on something :-) and it is never kept idle.
Thanks to JP, atleast the CC road that passes underneath the railway station is widened.
about 1 year ago
JP sir wake the admistration up
about 1 year ago
about 1 year ago