Kukatpally Housing Board Colony
hi.tech city railway station very highly traffic by
srilokesh Via Loksatta Kukatpally
in Hyderabad
, about 1 year ago
hi.tech city railway station very highly traffic...
hi.tech city railway station very highly traffic by
srilokesh Via Loksatta Kukatpally
in Khanamet
, about 1 year ago
hi.tech city railway station very highly traffic...
Traffic Congestion at JNTU x roads by
Kiran Via Loksatta Kukatpally
in Kukatpally Housing Board
, about 1 year ago
Ideally there should be a fly-over from before JNTU to after Nizampet X roa...
Veerendra
I don't think this will fix the issue. If we have a divider it will create a bottle neck and the 3 lines cannot be merged into one lane. Flyover/Underpass is the only option keeping the highway nonstop and also please take note that there are a lot of commercial complex being built near that circle which will double the traffic in the near future.
about 1 year ago
[Fixed] Status of Kukatpally to Hitechcity flyover by
sudhakar Via Loksatta Kukatpally
in Kukatpally Housing Board Colony
, about 1 year ago
Hi ,Subject : Status of Kukatpally to Hitechcity flyoverThis flyover is und...
George S
Finally ever waiting HITEC City Flyover is Opening on May 17th 2013. Hats-Off Mr. JP Your party won my heart.
Thanks for the history
http://www.kukatpallynow.com/traffic-and-roads/64-traffic-and-roads-hitec-flyover.html
8 days ago
George S
George S marked this issue as fixed.
8 days ago
Nischal
What is JP's share in getting additional funding?
What happened to the previous budget sanctioned to the developer?
When the previous developer has not completed the bridge where did all the sanctioned funds disappear?
Did you know that this bridge has costed an additional Rs.50 Crores now (at according to official estimates)?
Did you know this is all tax payers money who struggled commuting through this route for the last 5-7 years without a bridge?
I am abroad - Can at least some one in Hyderabad probe this matter through RTI pls?
7 months ago
Yatheen
This will be complete by Nov. Works are going in a fast pace. http://kukatpallynow.com/traffic-and-roads/64-traffic-and-roads-hitec-flyover.html
10 months ago
Loksatta_team
Message from LSP Kukatpally:
If there is one problem we can highlight in Kukatpally, it is the vexed issue of the HITEC City flyover. A third of the complaints we receive are about this issue. A few people ask us to travel during the rush hour to know what the pain is. Some of us do and are well aware of it. Instead of giving abstract speeches about the 'system', this is an attempt to list out the origin and progress of this issue so that the citizens can see for themselves what we have done and what we have not done.
1. The flyover was sanctioned in 2007. As is usual with government projects, the route was checked only superficially and it was not completely analyzed. The construction commenced.
2. When the construction approached the railway lines, the railway department got involved and objected. Since the flyover would go over their proposed electric lines, they put a hurdle that the construction cannot proceed. Now we have a deadlock.
3. This is when JP got elected (2009). JP and team realized that political pressure will not work because the railway department will simply show the rules that the existing design violates the railway rules.
4. We now started pushing the HMDA department to come-up with an alternate design but they said they did not have the budget. We found sources within the department that helped us raise this amount. In an instance which all volunteers remember, we had to move between 4 offices on a single day like a chase scene in a movie to get signatures from four principal secretaries. Now we have the work order for a new design.
5. HDMA agreed to start working on the alternate design. It took a few months to see this through and in an example of what we were doing in the interim, JP had to make nearly 40 phone calls to get the design passed.
6. We have a new design and the next step is for all the departments to agree to it. But the rivalry is so high that it took months and months of effort and meetings to make them sit and agree to all aspects. This finally happened in 2012.
7. 2012: Things are set as of now and all indications are that the flyover will be complete this year. JP also met the CM twice to ensure that there are no more delays.
about 1 year ago
Asif
Read 2 articles,but no clarity on final dates of operation.
http://articles.timesofindia.indiatimes.com/2012-01-15/hyderabad/30629601_1_hmda-scr-south-central-railway
http://www.thehindu.com/news/cities/Hyderabad/article2900990.ece
about 1 year ago
Asif
Its really unfortunate of Kukatpally, KPHB, Nizampet, .. residence , who have to travel daily to Hitec City going through the huge traffic at Hitec City Railyway station, in the midst of Sun burning on our heads.
about 1 year ago
Yatheen
The problem is, if the initial plan is implemented, the fly over touches the electric cables OR there will be no sufficient clearance b/w the cable and fly over. SO rly officials have objected it.
As per the new proposal,... two addl pillars(piers) will be laid on both sides of the track which will suddenly increase the height of the fly over.
After these two pillars are laid, a pier would be laid between the two tracks to join both the sides.
As of now, the process of laying two pierson both sides of the track is in progress... So, if work starts now, without any delay.... in another 3 mnths it must be ready. Interesting part is, everyday atleast one labourer will work on something :-) and it is never kept idle.
Thanks to JP, atleast the CC road that passes underneath the railway station is widened.
about 1 year ago
Venkat
JP sir himself mentioned in one of his interviews regarding the same subject, 'mottam vyavasta nidra potondi' - translation ' whole administartion is sleeping, so possibly the officials are sleeping and will continue to do so, it is the fate of the IT professional who communte on this road to keep facing trouble, look at the fly over pillars and to keep wondering about when that day comes when the flyover is over
JP sir wake the admistration up
about 1 year ago
Gopi
it looks like the matter is stuck at railways. how about filing a group RTI to know which official is sitting on it and what is the real issue for the delay
about 1 year ago
Stagnant water in bus stop by
Gopi
, over 2 years ago
There is lot of stagnant water in the bus stop causing lot of trouble to th...
Drainage and flood water lines by
s.v.subbarao in IDPL Staff Coop Housing Society
, over 2 years ago
Dear DC, Kukatpally Municipality,Hyderabad, The laying of drainage and floo...
Gopi
do we have a copy of the contract and work details of the laying of the drainage and flood water lines in your area? We can publish it here which will make people in Bhagath Singh Nagar aware of the slippage in the work
over 2 years ago
Trafic police required. by
Siddhardha in Kukatpally Housing Board
, over 2 years ago
This signal needs a trafic police in morning and evening times....
Loksatta
Traffic department is looking into this issue.
For now they employed someone at peek hours.
over 2 years ago
Roads are not good in KPHB 7th Phase MIG colony by
Jayaprakash in Kukatpally Housing Board
, over 2 years ago
Hello Sir, The roads are not good in KPHB 7th Phase MIG colony. Request y...
Siddhardha
If the roads are still the same ..
Visit www.Kukatpallynow.com and call Your Area AE and ask him for the status..
If they don't respond to your query Please call sambireddy and explain the problem.Please see his number in Contact Us section of the above website.
over 2 years ago
Compound wall for the burial ground by
Vidyaranya in Khanamet
, over 2 years ago
Dear JP Sir, The burial ground near Hi-Tech City Railway station doesn't ha...
Siddhardha
I got the below feedback from kukatpally loksatta office..
--------------------------------------------------------------
It is in estimation phase..I will request them to provide a soft copy of the estimate once it is ready..
--------------------------------------------------------------
Please call sambireddy (loksatta kukatpally incharge) for more details at 040-40150139.
over 2 years ago
Siddhardha
Got it.Will forward this to Loksatta Kukatpally.
Based on the legal aspects they will do the needful.
over 2 years ago
Vidyaranya
There are Christian and Hindu burial grounds. Compound wall is there for the Christian burial ground. There is no compound wall for Hindu burial ground. Please do the needful.
over 2 years ago
Vidyaranya
burial ground is on the left side of the bridge...
over 2 years ago
Vidyaranya
Sir,
When you go from KPHB 4th phase to Hitech city, you go under the railway bridge. This burrial ground is just beside the railway bridge (on the KPHB side). Dead bodies are burnt just beside the road. If you still not able to locate, please let me know. I will call you. I am in Japan.
over 2 years ago
Siddhardha
There is already a compound wall for this.
Let us know which area u r talking about.?
A photograph will help , if any of your friends can reach us then it will be much better..
My number 9849353368.
Thanks,
Siddhardha.
over 2 years ago
Terrible Roads in Sardar Patel Nagar area by
srinivas N Via Loksatta Kukatpally
in Vasantha Nagar
, over 2 years ago
Roads in the interior parts of sardar patel nagar. Near chaitanya techno gi...
Sambi Reddy
becuase of hose constructions.........
over 2 years ago




about 1 year ago